Can RunMark schedule both HDPE and PVC pipe?
Yes. Configure products, materials, eligible lines, and production rates separately so HDPE and PVC work follows the constraints you define.
Can I plan in footage when my line rate is pounds per hour?
Keep a consistent production quantity for scheduling and use the product’s weight-per-foot relationship when converting. The public capacity calculator also requires demand and throughput to use the same selected unit.
Does RunMark optimize die-change sequencing automatically?
RunMark records capabilities, rates, and schedule timing. Teams can use those facts to place compatible runs together; it does not claim a fully autonomous changeover optimizer.
What can appear on a pipe traceability label?
Available label fields include product, production date, line, run number, unit number, order reference, part number, and company identity.
Do we need to replace our accounting or ERP system?
No. RunMark is designed as a focused production scheduling and traceability layer and can start from direct entry or Excel order imports.
How long is the free trial?
The trial provides 30 days of access with no credit card and no automatic charge.